<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd"> <html xmlns="http://www.w3.org/1999/xhtml"> <head> <META http-equiv="Content-Type" content="text/html; charset=utf-16"> <title>Inwood Consulting Engineers - News</title> <meta http-equiv="Content-Type" content="text/html; charset=UTF-16"> <link href="news.css" rel="stylesheet" type="text/css" media="all"> </head> <body> <table width="500" border="0" cellspacing="0" cellpadding="10"> <tr> <td align="left"> <table width="98%" border="0" cellspacing="0" cellpadding="0"> <tr> <td><img src="../images/News_logo.gif" alt="" width="230" height="70" border="0"></td> <td><span class="NewsRelease">Media Release</span></td> </tr> </table> </td> </tr> <tr> <th class="NewsHead2" align="center"> Inwood's Stormwater Management Team to Design North Florida Parkway Culvert Improvements </th> </tr> <tr height="370"> <td height="370"> <p><span class="Newsbody">October 2006 - Inwood Consulting Engineers, Inc. has been awarded the North Florida Parkway Culvert Improvements Project by Osceola County. The primary goal of this project is to provide localized flooding relief to the North Florida Parkway and Satinwood Circle area in Buenaventura Lakes (BVL).  This project is one in a series of culvert replacement projects intended to provide relief to the Bass Slough Basin portion of the BVL Master Drainage System.  The project will aid in reducing flood stages at Osceola Parkway, a major arterial roadway and evacuation route.</span></p> <p><span class="Newsbody">Inwood will be responsible for preparing construction plans and documents as well as other services as set forth in the scope of work. In addition, Inwood will hold meetings to coordinate with the state and local agencies that will have an influence upon the preparation of the design.</span></p> <p><span class="Newsbody">Inwood's previous work experience with Osceola County and more specifically in the area of BVL, will aid in the success of this project. In 2003, Inwood completed the Bass Slough Basin Management Plan which included a detailed modeling of the BVL Master Drainage System in the project area. The plan included recommendations for conceptual culvert improvements in BVL, including the area that is the subject of this project.</span></p> <p align="center">###</p></td> </tr> <tr height="214"> <td> <p><span class="NewsHead">About Inwood Consulting Engineers Inc.</span></p> <p><span class="newsbtn">Inwood Consulting Engineers, Inc. provides quality civil, transportation, environ-mental, planning, and public involvement consulting services to governmental clients throughout the state of Florida. Inwood s main office is located in Oviedo, Florida. In 2009, the firm opened two satellite offices in Port St. Lucie and Tavares, Florida. Since it s inception in 1995, Inwood has grown to a staff of over 40 and has developed a reputation for tenacity in meeting project schedules, honoring commitments, and providing innovative solutions to difficult challenges. For more information on Inwood s services and projects, please visit www.inwoodinc.com.</span></p></td> </td> </tr> </table> </body> </html>