Osceola Parkway Phase 2 Widening

Osceola County

As the prime consultant, Inwood provided environmental services to assist Osceola County with permitting through the South Florida Water Management District (SFWMD) for the Osceola Parkway Phase 2 Roadway Widening project. Inwood performed a GIS-based, cumulative impact analysis for the East Lake Tohopekaliga drainage basin. The analysis documented the potential of the project to result in unacceptable adverse cumulative impacts. In accordance with SFWMD review criteria, the analysis also considered similar projects which may reasonably be located within wetlands or other surface waters in the same drainage basin as the proposed project (East Lake Tohopekaliga drainage basin).

Project Completion Date: 
September 2012